Class: TaskJuggler::ChartPlotter

Inherits:
Object
  • Object
show all
Defined in:
lib/taskjuggler/reports/ChartPlotter.rb

Instance Method Summary collapse

Constructor Details

#initialize(width, height, data) ⇒ ChartPlotter



23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
# File 'lib/taskjuggler/reports/ChartPlotter.rb', line 23

def initialize(width, height, data)
  # +------------------------------------------------
  # |             ^
  # |   topMargin |             legendGap
  # |             v             <->
  # |              |               -x- foo
  # |<-leftMargin->|               -x- bar
  # |              |               <-legend
  # |              |                 Width---->
  # |              +------------
  # |             ^             <-rightMargin->
  # | bottomMargin|
  # |             v
  # +------------------------------------------------
  # <-----------------canvasWidth-------------------->
  # The width of the canvas area
  @width = width
  # The height of the canvas area
  @height = height
  # The raw data to plot as loaded from the CSV file.
  @data = data

  # The margins between the graph plotting area and the canvas borders.
  @topMargin = 30
  @bottomMargin = 30
  @leftMargin = 70
  @rightMargin = (@width * 0.382).to_i

  @legendGap = 20
  @markerWidth = 20
  @markerX = @width - @rightMargin + @legendGap
  @markerGap = 5
  @labelX = @markerX + @markerWidth + @markerGap
  @labelHeight = 24

  # The location of the 0/0 point of the graph plotter.
  @x0 = @leftMargin
  @y0 = @height - @bottomMargin

  @labels = []
  @yData = []
  @xData = nil
  @dataType = nil
  @xMinDate = nil
  @xMaxDate = nil
  @yMinDate = nil
  @yMaxDate = nil
  @yMinVal = nil
  @yMaxVal = nil
end

Instance Method Details

#generateObject

Create the chart as Painter object.



75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
# File 'lib/taskjuggler/reports/ChartPlotter.rb', line 75

def generate
  analyzeData
  calcChartGeometry
  @painter = Painter.new(@width, @height) do |pa|
    drawGrid(pa)
    0.upto(@yData.length - 1) do |ci|
      # Compute a unique and distinguishable color for each data set. We
      # primarily use the hue value of the HSV color space for this. It
      # has 6 main colors each 60 degrees apart from each other. After the
      # first 360 round, we shift the angle by 60 / round so we get a
      # different color set than in the previous round. Additionally, the
      # saturation is decreased with each data set.
      color = Painter::Color.new(
        (60 * (ci % 6) + (60 / (1 + ci / 6))) % 360,
        255 - (ci / 8), 230, :hsv)

      drawDataGraph(pa, ci, color)
      drawLegendEntry(pa, ci, color)
    end
  end
end

#to_svgObject



97
98
99
# File 'lib/taskjuggler/reports/ChartPlotter.rb', line 97

def to_svg
  @painter.to_svg
end